Sign In | Join Free | My ccnmag.com
China Qingdao KXD Steel Structure Co., Ltd logo
Qingdao KXD Steel Structure Co., Ltd
TO BE THE FIRST CLASS STEEL BUILDING FABRICATOR
Verified Supplier

1 Years

Home > Steel Structure Building >

Factory Directly Supplying Wide Applicating Prefab Steel Structure Frame Buildings

Qingdao KXD Steel Structure Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Factory Directly Supplying Wide Applicating Prefab Steel Structure Frame Buildings

Brand Name : KXD

Model Number : KXD-SW22

Certification : ISO9001:2008

Place of Origin : China Qingdao

MOQ : 200 square meters

Price : USD 40-85 Per Square meter

Payment Terms : T/T, L/C

Supply Ability : 5000-9000 tons Per Month

Delivery Time : 35-55 days

Packaging Details : steel pallet & wooden box or in bulk

Profile : Hot rolled H steel / Weld H steel

Material : Q355b, Q235b

Technician : Free technical support

Design : Custom exactly as the demands

Drawing : 3D model and installing drawing available

Production : Finished for direct install support

Coating : Alkyd painting, Epoxy painting, Hot dip galvanized

Insulation : EPS, Glasswool, Rockwool, PU on option

Standard : Different standards on option as demands

Install : Online guide support & On-site install

Service life : 30-50 years

Visit : Workshop visit and check available

Contact Now

Factory Directly Supplying Wide Applicating Prefab Steel Structure Frame BuildingsFactory Directly Supplying Wide Applicating Prefab Steel Structure Frame Buildings

Factory Directly Supplying Wide Applicating Prefab Steel Structure Frame Buildings

Factory Directly Supplying Wide Applicating Prefab Steel Structure Frame Buildings

Factory Directly Supplying Wide Applicating Prefab Steel Structure Frame Buildings

Five commonly used assembly methods for steel structural components:

1. Ground sampling method

Assembly method: Use a ratio of 1:1 to put the actual components on the assembly platform. Then, according to the position of the parts on the actual sample, they are assembled into components.

Use range:

Small batch structure assembly, such as trusses and frames

2, Copy and assembly method

Assembly method: First assemble into a single-sided (single piece) structure by ground pattern method. And the spot welded is necessary. Then turn over as a duplicate tire mold, assemble another single-sided structure on it, and assemble twice.

Use range:

Truss structure with symmetrical cross sections

3, Stand up method

Assembly method: Choose top-down or bottom-up assembly according to the characteristics of the component and the stable position of the parts.

Use range

Used to configure a stable, low-height structure or large diameter cylinder

4, Lying down method

Assembly method: assembly on the position where the component is placed.

Use range:

Used for slender members with small cross-section but large length

5. Fetal membrane assembly method

Assembly method: the assembly of the parts of the component with the tire mold positioned at its assembly position.

Use range:

Used to manufacture products with large batches of components and high precision

Factory Directly Supplying Wide Applicating Prefab Steel Structure Frame Buildings


Factory Directly Supplying Wide Applicating Prefab Steel Structure Frame Buildings

Factory Directly Supplying Wide Applicating Prefab Steel Structure Frame Buildings

Main components Base Cement and steel foundation bolts
Main frame H-section steel
Material Q235B, Q345B or others as buyers' requests.
Purlin C / Z Steel: Size from C120~C320, Z100~Z20
Bracing X-type or other type bracing made from angle, round pipe
Bolt Plain bolt and High-strength bolt
Roof & wall Sandwich panel or Single steel sheet
Door Sliding door / Rolling door / Securing door
Window Aluminium alloy frame
Surface Total four layers of Anti-rust Painting or Galvanized

Factory Directly Supplying Wide Applicating Prefab Steel Structure Frame Buildings

Factory Directly Supplying Wide Applicating Prefab Steel Structure Frame Buildings

Steel Frame Installation

---Steel column installation

The steel column should be lifted by one-point straight lifting lashing method. When in place, align the anchor bolts and slowly drop. After alignment, screw on the nut to temporarily fix the column, correct its plane position and verticality. After the correction, finally screw the nut and use the backing plate is welded firmly to the column bottom plate. Then the column bottom is grouted and fixed.

---Steel crane beam installation

The crane beam is lashed at two points, and when hoisting, the aerial posture of the components during the hoisting process is controlled by a sliding rope to facilitate alignment and avoid collisions. After being temporarily fixed in place, the verticality, elevation, and vertical and horizontal axis positions of the crane beam should be corrected.

---Roof system installation

The roof truss installation should be carried out after the columns are calibrated and fixed. The roof system can be hoisted after the expansion assembly assembly, and the expansion assembly assembly unit should become a spatial structure with certain rigidity. The installation of purlins and other components should be carried out after the roof truss is adjusted and positioned.


China Factory Directly Supplying Wide Applicating Prefab Steel Structure Frame Buildings wholesale

Factory Directly Supplying Wide Applicating Prefab Steel Structure Frame Buildings Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Qingdao KXD Steel Structure Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)